Ground Preparation and Machine Design Animation
Silent promotional video · 36.5 seconds

Fine levelling should support the construction equipment, operation or finished product that follows.
Bulk earthworks establish the site. Where appropriate, controlled grading can prepare a more consistent surface for compaction, another material layer, drainage work, pavement preparation, landscaping or another specialised operation.
The Dugong does not replace excavators, bulldozers, graders, rollers or engineering requirements. It is another tool where tractor-towed controlled grading suits the circumstances.
site preparationfine gradingpadsconstruction support
Silent promotional video · 36.5 seconds